Ask us about this month’s promotional offer!

Deck Stairs Installation & Repair in Lincoln, NE

New deck stairs and honest repairs, built square, even, and solid underfoot, so the part of your deck you use most never feels sketchy.

Multi-level composite deck with custom stairs and railings for a backyard outdoor living space

Need Deck Stairs Built or Repaired? Here's Why Homeowners Choose Deck Bros

Stairs do the hardest job on a deck. Every trip outside lands on them, weather hits them from above and below, and the bottom step sits right where moisture collects, so they wear out faster than anything else you have built. 

That is also why a bad set of stairs is the quickest way to get hurt in your own backyard. We build and repair deck stairs that stay tight for the long haul. 

The stringers get cut and spaced to carry real weight, the treads and risers are fastened so nothing shifts or squeaks, and every flight gets a handrail you can actually grip and guards that meet code. When we are repairing rather than rebuilding, we chase down what is actually failing instead of patching the symptom.

Composite deck stairs with black aluminum railings overlooking a landscaped backyard

Stair Styles and Configurations We Build

The right staircase depends on how tall your deck is and where you want to land in the yard. These are the setups we build most.

See Our Work

We have built and rebuilt deck stairs of every height across the Omaha and Lincoln area we serve, the short two-step flights off a low deck and the tall switchbacks with a midway landing on a second-story walkout. Every set gets the same attention: square stringers, even risers, and a handrail that does not budge. 

Take a look through the gallery to see a few.

800+
new decks built
300+

decks repaired

30+

years of combined experience

3-day

build time available

TimberTech composite decks logo
Fiberon composite deck logo
The BBB accredited business badge logo
The Google Guaranteed badge
Trex composite decks logo
Westbury aluminum railing logo

We hold Google Guaranteed status and BBB accreditation, and we build as a certified TimberTech Platinum Contractor and an authorized dealer for Trex, Fiberon, and Westbury railing.

What People Say About Us

We would rather let the work make our case than do it ourselves. The reviews tend to land on the same things, the professionalism, the follow-through, and how the finished result actually holds up. Here are two.

d

Debra Whisonant

Rated 5 out of 5

Luan and his crew are first rate deck builders. They refurbished and re-supported our old deck and added on additional new decking in a week after all was approved by the city of Lavista. 

The only problems were with the composite supplier which Luan handled quickly. Definitely recommend them if you are looking for a new deck or want to update an old one.

t

Travis Thomas

Rated 5 out of 5

They did a excellent job. Crew was professional. I live 2 hours from Omaha and they took the job without that being an issue. Our deck turned out beautiful.

We have the best looking deck in town. I am so glad that we chose Deck Brothers. If you want quality, go with Deck Brothers It will the best choice you make

Signs Your Deck Stairs Need Repair

Because stairs take the most wear, they usually warn you before they fail. A few signs mean it is worth having them looked at before they turn into a hazard.

The Code Standards We Build Every Staircase To

Solid stairs are not only about looks. They have to meet code so they pass inspection and feel right underfoot. These are the standards we build to on every flight, with your local building department setting the final figures.

Element What Good Deck Stairs Need
Riser Height No taller than 7¾ inches, with every riser within ⅜ inch of the others so the steps stay even.
Tread Depth At least 10 inches deep for a full, stable footing.
Stair Width A minimum of 36 inches so two people can pass comfortably.
Handrail Required once there are four or more risers, mounted 34 to 38 inches above the nosing, and shaped to actually grip.
Guards and Balusters Required on open sides above 30 inches, with gaps too small for a 4-inch sphere to slip through.
Landing and Footings A solid landing pad at the base, on footings set below the frost line so winter heave cannot lift it.

On Time and Done Right

Budget 

A new or rebuilt staircase should not turn your week upside down. Most stair jobs move fast, often a single day once the materials are on hand, and we hold to the schedule we set rather than letting it drift.

Timeline 

We show up when we say we will, keep the work area swept, and haul off the old lumber and hardware when we leave. You get a flight that is square, solid, and ready to use the moment we pack up, backed by our 5-year workmanship warranty.

Our Deck Stairs Installation and Repair Process

We keep deck stairs installation and repair simple and handle the heavy, fiddly parts for you.

The owner of Deck Bros, Luan, with a happy customer

1

Assess

We look at your deck, measure the rise and run, and work out whether a repair or a fresh build makes the most sense.
A deck building in progress

2

Build

We cut and set the stringers, fasten the treads and risers, and add the handrail and guards to code.
an elevated screened-in porch with a set of stairs

3

Walk

We test every step, walk the finished flight with you, and clean up before we go.
Elevated composite deck with aluminum railings, stairs, and covered patio for outdoor living

FAQs About Deck Stairs Installation and Repair in Lincoln, NE

Yes. The stairs are a structure of their own, fastened to the deck, so we can rebuild or repair a flight on its own and leave the rest of your deck untouched.

It comes down to what is failing. A loose handrail, a couple of bad treads, or rusted hardware are straightforward repairs. Once the stringers themselves have rotted or the whole flight is bouncing and pulling away, a rebuild is the safer call and lasts far longer. If the rest of the deck is going at the same time, a full deck rebuild may make more sense, and we will give you an honest read either way.

Most take a single day once the materials are ready, though a tall switchback with a landing or a complete tear-out and rebuild can run a little longer. We keep an eye on the forecast, since rain can push outdoor work.

We match your deck. Stringers are pressure-treated for moisture resistance, treads come in composite, cedar, or pressure-treated wood, and railings in aluminum, cable, or wood. Composite treads add grip and never need staining.

Often, especially when you are adding a new flight, changing the structure, or altering the railing. We handle the permit and the inspection so the paperwork never becomes your problem.

We build for it. Grooved composite treads shed water and add traction, the landing footings go below the frost line so they do not heave, and we can wire in step lighting so the flight stays visible on dark evenings.

Don't Wait for a Step to Give Out

Stairs are the one part of a deck you use every single day, and a good set changes how the whole space feels. Some need a full rebuild and others just a fix before someone takes a spill, and either way we will get them square, safe, and solid to use for years. 

Call us at (402) 600-0810 or send a message here.

The owner of Deck Bros, Luan

Luan Nguyen

(takes 1-2 min)
Luan Nguyen, owner of Deck Bros

Hi, I’m Luan, the owner of Deck Bros. Please fill out the quick form below (takes 1-2 min) and I’ll personally get back to you with a phone consultation shortly.